Choose the post layout before trying to count individual balusters. A baluster’s catalogue height is not the height of the assembled guard.
Break the outline into bays
Mark the start and end of every straight run on plan. Give corner posts and end posts distinct labels, then identify any junction at a wall or gate. Dimension between named faces or centrelines and state which convention you used.
Give the stair its own elevation
Show where the level terrace becomes a sloping flight and where it meets a landing. Draw the proposed rail line and the post positions. A photo looking down the stairs can hide the change in level; a simple side elevation is usually more informative.

Keep the visual rhythm separate from approval
Sketch the desired spacing within one representative bay. Repeated bays can look uneven if the remainder is left to the last piece. Final spacing, guard height, loading and anchorage need review for the actual project; don’t use a model count as approval.
- Submit a bay-by-bay plan with post positions and dimensions.
- List the baluster, rail and post references separately.
- Identify level runs, stair runs and transitions to walls or landings.

