A window opening width is not automatically the finished sill length. Show where the stone begins and ends.
Start with one row per opening type
Label the openings on an elevation and use the same labels on your list. Group identical openings only if their sill geometry and end conditions also match. Two windows of equal width can need different pieces if one meets a corner and the other sits between flat jambs.
Record height and projection independently
The catalogue’s S-11 is 7 inches high with a 4½-inch projection; S-11B is 9⅞ inches high with a 5½-inch projection. The suffix changes more than the height. On a wall section, mark the finished cladding face so the team can see where the front of the chosen sill would sit.

Describe the ends in plain language
Say “exposed on the left, meets trim on the right” if that describes the opening better than a technical term. Mark any part of the sill that extends beyond the jamb. If a joint or return is intended, show its location; if it hasn’t been decided, leave a note rather than assuming a single continuous piece.
What a useful schedule row contains
You can send this information in a spreadsheet or directly on a marked elevation. A field dimension and a design dimension should not look identical on the sheet.
- Opening ID and quantity; catalogue reference or a shortlist.
- Measured opening width, proposed overall sill length and units.
- Left and right end conditions, wall section and any unresolved dimensions.