Sketch the firebox opening, the proposed stone surround and the available wall as three separate outlines.
Identify the opening you measured
Write down the width and height and label what the tape touched: the visible opening, the appliance frame or the unfinished opening. Include the fireplace manufacturer, model and current installation instructions if available. Those measurements describe different things; a catalogue picture cannot resolve the difference.
Measure the wall before falling for a shelf
Draw a front view showing the usable wall width and height. Mark adjacent doors, windows, cabinets and any existing trim. Add a side sketch for shelf projection and hearth depth. A photograph taken straight on helps explain the sketches; include dimensions on the drawings rather than expecting someone to scale the photo.

Shortlist by opening first, silhouette second
Compare the inner opening and then the outer legs and shelf in the official mantel drawings. A deeper shelf can change the whole composition even when the opening looks right. Save the exact FMG or FBG reference you liked, and note whether the hearth or an overmantel is also part of the request.
Flag what must be confirmed
This is a selection sketch, not an installation or clearance calculation. Have the project team check the appliance instructions and applicable requirements for the entire assembly before approving a surround.
- Send the labelled elevation, side sketch and appliance information.
- Identify existing versus proposed finishes and the intended finished floor level.
- Mark unconfirmed measurements as estimates; ask for a project drawing before fabrication.

